Archive

Posts Tagged ‘Schedule’

SnapMirror Replication Scheduling Spreadsheet

February 21st, 2009

I created an Excel spreadsheet as I was tasked with creating a SnapMirror replication schedule for a customer that only had an 8meg line. The problem was that the replication would fail if more than 1 transferred happened at the same time. So I needed a way of calculating the rate of change, and designing the replication based on this.

The spreadsheet will calculate the snapmirror.conf schedule, but will also give you the commands to create, restrict and initialize the volumes.

VN:F [1.9.11_1134]
Rate this post:
Rating: 0.0/10 (0 votes cast)

General , , ,



This site is not affiliated or sponsored in anyway by NetApp or any other company mentioned within.

Bad Behavior has blocked 37978 access attempts in the last 7 days.

© 2009-2012 Chris Kranz All Rights Reserved
This site is not affiliated or sponsored in anyway by NetApp or any other company mentioned within.